6 Franklin Street, Braintree, MA - Premium Lakefront Development Opportunity

Property Overview

Address: 6 Franklin Street, Braintree, MA 02184
Lot Size: 4,556 square feet
Zoning: Residence B District
Parcel ID: BRAI M:1010 B:0 L:7
Special Feature: Direct frontage on Sunset Lake

Property History

This unique lakefront property originally featured a single-family home built in 1935 (1,291 sq ft, 3 bedrooms, 1 bathroom). Following a fire loss, the structure was demolished in June 2025 under town direction, leaving a cleared, buildable lot with protected rebuilding rights.

Critical Timeline: Building permit must be obtained by June 1, 2027 to maintain grandfathered development rights.

Three Development Options

Option 1: Single-Family Rebuild (As-of-Right)

Legal Status: Protected under Braintree Bylaws Article 4, Section 135-403
Requirements:

  • Must match original foundation footprint (per pre-demolition survey)

  • Cannot exceed original cubic content

  • Must meet current energy codes (HERS rating 42-45)

  • 100 MPH wind zone compliance required

Advantages:

  • No special permits or public hearings required

  • Straightforward building permit process

  • Protected nonconforming use rights

Option 2: Single-Family + Accessory Dwelling Unit (ADU)

Legal Status: Allowed by-right under 2025 Massachusetts ADU law
Specifications:

  • Maximum ADU size: 900 sq ft

  • Current setbacks: 5 feet (may increase to 8 feet)

  • Building coverage limit: 35% of lot (1,594 sq ft maximum)

Requirements:

  • Conservation Commission approval (due to Sunset Lake proximity)

  • Stormwater management plan required

  • Professional engineering for lakefront construction

Income Potential: Rental income from ADU unit

Option 3: Two-Family Conversion

Eligibility: Property qualifies (built pre-1940, 6+ rooms)
Challenge: No precedent for conversion on demolished structures
Process Required:

  • Planning & Community Development Director approval

  • Planning Board special permit

  • Public hearing process

  • Site plan review compliance

Environmental & Regulatory Considerations

Sunset Lake Proximity

  • 100-foot buffer zone from shoreline applies to all construction

  • Conservation Commission review required for any development

  • Wetlands Protection Act compliance mandatory

  • Enhanced stormwater management requirements

Technical Requirements

Building Standards

  • Energy Code: Stretch code compliance required

  • Foundation: New engineering required for lakefront conditions

  • Flood Zone: Property in Flood Zone A - elevation requirements apply

  • Utilities: Public water, sewer, and gas available

Inspection Process

Six-stage inspection sequence from excavation through final completion, with special attention to:

  • Soil conditions and foundation engineering

  • Waterproofing and flood protection

  • Trade installations (electrical, plumbing, HVAC)

  • Final structural integrity

Investment Highlights

Unique Advantages

  1. Protected Development Rights: Grandfathered rebuilding privileges

  2. Lakefront Location: Direct Sunset Lake frontage - rare in suburban Boston

  3. Multiple Income Streams: ADU or two-family potential

  4. Strong Market: Braintree real estate market highly competitive

  5. Transportation Access: Near Braintree commuter rail station

Considerations

  • 2-year building permit deadline

  • Conservation Commission approval required

  • Potential ADU setback changes pending

  • No precedent for two-family conversion on demolished structure

Next Steps for Buyers

Due Diligence Recommended

  1. Wetlands Delineation: Professional survey to confirm 100-foot buffer boundaries

  2. Town Department Consultations: Meetings with Planning, Conservation, and Stormwater departments

  3. Professional Team Assembly: Architect, engineer, and environmental consultant familiar with lakefront construction

Documentation Available

  • Pre-demolition survey showing original structure

  • Zoning analysis and development options study

  • Regulatory timeline and approval process guide

This rare lakefront development opportunity combines protected rebuilding rights with income potential in one of Braintree's most desirable locations. The 2-year development window creates urgency while providing certainty for qualified buyers.

Disclaimer: All regulatory information based on meetings with Braintree officials as of 2025. Buyers should confirm current requirements with appropriate town departments before proceeding.